Home | Energy | Mobile Wind Turbine Speeds Up Site Survey

Mobile Wind Turbine Speeds Up Site Survey

Ever wonder how they plan wind farms?  A lot more energy and assessment goes into the area that just an open field and some tall poles.  Survey equipment is often erected to determine the absolute premium location for each turbine.  Setting up poles and milling through data has been the only method for planning wind farms… until now.

The mobile wind turbine by Pope Design moves to follow the wind or to collect data.  It no longer takes a whole crew of workers and a crane to collect data over and over.

Another possible use is mobile wind generation.  Military applications are endless, as are heavily rural or undeveloped areas.  A mobile electrical plan is just what many communities need, especially those in transition.  Additionally, disaster areas are ripe for utilization of this new technology.

Source

Check Also

Three green jobs to look for in 2013

3 Green Jobs to Watch in 2013

While the U.S. economy has been slow to embrace the going green movement, there are …

Leave a Reply

Your email address will not be published. Required fields are marked *